Project 5
Project 5
Supply & fixing of only rock-wool mattresses of 100 kg/M3 backed with GI wire net (thickness 40mm, 50mm, 75mm, 100mm),
Supply & fixing of aluminium foil, SS/ALLUMINIUM cladding,
Supply & fixing with glass cloth for sun protection on PIPLINE and duct insulation, supply & fixing of REXENE below,
Fixing of grill, fixing of HEPA box, HEPA filter, fixing of damper, supply & fabrication & fixing of 20/22/24 SWG ducting.